Multiple Choice Questions on Civil Engineering | Objective Questions | Civil Engineering Quiz | MCQ
- (A) strict adherence to specifications
- (B) separation of planning and design part
- (C) each individual maintains functional efficiency
- (D) all the above
- (A) is an improvement upon bar chart method
- (B) provides a realistic approach to daily problems
- (C) avoids delays which are very common in bar charts
- (D) All the above
3 >>CPM is ?
- (A) synthesising in concepts
- (B) is based on time estimate
- (C) is used for repetitive works
- (D) all the above
- (A) positive
- (B) negative
- (C) zero
- (D) same
Download
5 >>Construction team means ?
- (A) an engineer
- (B) an architect
- (C) an owner
- (D) all the above
- (A) number of operations
- (B) output of labour
- (C) output of machinery
- (D) all the above
- (A) instructions by the executive engineers
- (B) construction measurements
- (C) issue of store equipments
- (D) names of the casual labour
- (A) 25000
- (B) 50000
- (C) 100000
- (D) 200000
- (A) unity of command
- (B) cohegency
- (C) effective control at all levels
- (D) all the above
10 >>The estimated time required to perform an activity, is known as ?
- (A) event
- (B) dummy
- (C) duration
- (D) float
- (A) CPA (Critical Path Analysis)
- (B) CPP (Critical Path Plotted)
- (C) Critical Path Scheduling)
- (D) All the above
- (A) normal time
- (B) slow time
- (C) crash time
- (D) standard time
13 >>If the total float and duration of an activity are 5 and 10 days respectively, the particular activity can be ?
- (A) started 5 days later
- (B) completed 5 days later
- (C) performed at slower rate in 15 days
- (D) all the above.
- (A) projects
- (B) major projects
- (C) minor projects
- (D) all the above
- (A) establishes the relative priorities among various activities on a common basis
- (B) determines the status of each activity
- (C) is a dynamic system
- (D) none of these
- (A) minor works
- (B) major works
- (C) large projects
- (D) all the Above
- (A) Bar chart method
- (B) Milestone chart
- (C) Critical path method (CPM)
- (D) Programme Evaluation and Review Technique (PERT)
- (A) LSTEST
- (B) LFTEFT
- (C) TLEFT
- (D) all the above
- (A) Executive Engineer
- (B) Engineer
- (C) Junior Engineer
- (D) Sub overseer
- (A) planning
- (B) designing
- (C) execution
- (D) all the above